GeoPro Talks: Metal Leaching and Acid Rock Drainage Tests under Protocol 19 Soil Regulations
![Protocol 19 Soil Regulations](https://geoenviropro.com/wp-content/uploads/2023/12/christian-wiediger-J8X3iKaLheA-unsplash-1024x683.jpg)
BC’s Stage 14 Amendments to the CSR brought many changes, including Protocol 19, which outlines testing requirements when relocating non-waste soil from a source to a receiving site. For quarried material derived from bedrock, special testing requirements apply, including metal leaching and acid rock drainage (ML/ARD) evaluations, which are to be conducted by static tests […]